Meat & Poultry · Cut & Debone

Cutting & Deboning Room Floors That Install Cold

Fabrication and debone rooms run cold, wet and greasy for two shifts, then get a hot washdown. Fat builds up underfoot, knives and hooks hit the floor, and combo bins and pallet jacks roll constantly. Most floor systems can’t even be installed in a cold room. PumaCRETE urethane concrete flooring cures down to 35°F, so the room stays cold while the new floor goes in.

35°F

Minimum cure temperature

0.06 g

Abrasion loss (ASTM C501)

0.6–0.9

Wet coefficient of friction

5-yr

Written warranty

GET A FREE QUOTE

Item 2
Item 4
Item 5
Item 6
Item 6
Item 6
Item 6
Item 6
Item 6
Item 6

What a cut room does to a floor

Fat buildup and slip risk

Trim and fat collect at workstations and make floors slick. Slip-grade texture keeps footing secure, and the sealed surface releases fat during washdown.

Cold rooms that can’t shut down

Fabrication rooms are held cold to protect product. Epoxy needs temperatures well above 60°F to cure; PumaCRETE cures down to 35°F.

Dropped knives, hooks and trim

Steel tools and frozen product land on the floor all shift. The troweled system resists the impact and abrasion that chip thin coatings.

Combo bins and pallet jacks

Loaded bins and jacks roll the same lanes daily. Abrasion loss of 0.06 g (ASTM C501) means the floor wears slowly under wheels.

Cold-to-hot washdown

Rooms go from the 30s and 40s °F to hot sanitation water every night. Thermal expansion matched to concrete prevents cracking and delamination.

Packaging next door

Vacuum packing and boxing sit right beside wet cutting lines. One system covers both, with texture adjusted for each.

Recommended system by zone

One urethane concrete system, configured for the room you’re standing in. Thickness, texture and cove are set zone by zone. Add 1/8 in for integral cove.

ZoneRecommended systemKey exposures
Primal breaking and fabrication401-HF, 1/4 in, slip-gradeFat, impact, cold, nightly hot washdown
Deboning and trim lines401-HF, 1/4 in, slip-gradeFat buildup, foot traffic, knives
Grinding and portioning401-HF, 1/4 in + coveFat, equipment washdown, cold
Vacuum packing and boxing401-HF, 1/4 inCart and pallet traffic, light wet
Combo bin and pallet aisles401-HF, 1/4 inWheel wear, forklift turns
Coolers and holding rooms401-HF, 1/4 in (cold cure)35°F install, condensation

 

Installing without warming the room

Installed at room temperature

No warm-up needed. PumaCRETE cures at 35°F, with an optimal range of 40–50°F, which matches most fabrication rooms.

Weekend changeovers

Lines are phased so a section can be prepped Friday night and back in production after a 24-hour cure.

HEPA-contained prep

Dust is captured at the grinder so it doesn’t reach packaging or neighboring product areas.

Sanitation and safety

  • Meets 9 CFR Part 416 sanitation performance standards
  • Seamless, non-porous surface supports HACCP and Sanitation SOPs
  • Aligned with SQF, BRC, IFS and FSSC 22000 audit expectations
  • OSHA-compliant slip resistance (wet coefficient of friction 0.6–0.9)

Performance data

PropertyPumaCRETE 401-HF
Compressive strength9,500 psi (ASTM C579)
Tensile strength1,450 psi (ASTM C307)
Flexural strength3,200 psi (ASTM C580)
Bond to concreteExceeds substrate (ASTM D7234)
Abrasion resistance0.06 g loss (ASTM C501)
Impact resistance>160 in-lb (ASTM D2794)
Service temperature-40°F to 248°F
Thermal shockPass, boiling-to-ambient cycles
Wet coefficient of friction0.6–0.9 (tunable)
Vapor pressure toleranceUp to 25 lbs through the slab
Minimum install temperature35°F (operating coolers)
Standard thickness1/4 in (3/8 in in thermal zones)

Standard 1/4-inch PumaCRETE 401-HF system. Full test data is on the technical data sheets.

Three ways to buy, direct from the manufacturer

Every system on this page is made by PumaCRETE and sold direct, with no distributor markup.

Buy the materials

Urethane concrete, primers, topcoats and cove kits shipped direct from the manufacturer to your plant. No distributor markup.

Buy it installed

Turnkey installation by factory-trained crews, with material and workmanship warranties from a single source.

Train your own crew

A factory-employed PumaCRETE trainer certifies your maintenance team or local contractor on your slab: prep, mixing, troweling, cove and testing.

Frequently Asked Questions

Cutting & Deboning Room Floors FAQ's

Yes. PumaCRETE cures down to 35°F, so the room can stay cold during installation. The optimal install range is 40–50°F.

We broadcast aggregate into the surface for a wet coefficient of friction in the 0.6–0.9 range, and the sealed surface lets fat release under normal washdown instead of soaking in.

Abrasion testing shows 0.06 g loss (ASTM C501). The texture is retained as the floor wears, unlike coatings that polish smooth.

 

Installed cost typically runs $8–$15 per square foot depending on thickness, prep and drainage work. We provide a written spec and budget after a site assessment.

EXPERIENCE AND EXPERTISE

Ready to spec your cutting room floor?

Get a no-obligation site assessment. We review your rooms, chemistry, temperatures and production calendar, then deliver a written specification and budget within five business days.