Skip to content

INSTALLATION INSTRUCTIONS

The links below provide provide detailed instructions (both written and visual) for installation of PUMA-CRETE® flooring.   This information expands on the information in the technical data sheets, to provide easy step-by step directions for installation, along with tools/supplies required.

Our popular 300/400 series flooring (urethane concrete) and coatings may be installed by as little as one man.  However, larger projects shall require from 2 to 5 person team, for ease of installation.

SURFACE PREP INSTRUCTIONS

 

SURFACE PREP INSTRUCTIONS         PDF-DOWNLOADABLE DOCUMENT

TOOLS and SUPPLIES

INSTALLATION INSTRUCTIONS

SLURRY BASE COAT   

ROLL-ON LOCK COAT 

 

SQUEEGEE/ROLL 

ESD URETHANE                                                            

301-SL, 301-SLB  401 HFB

107-PumaPOXY, 108-PumaSpartic, 110-PumaLAC

 

106 PumaLAC,  107 PumaPoxy,  108 PumaSPARTIC 

112 PumaESD

"With a tradition of quality and durability, we have over 30 years of experience serving the needs of our customers -- we have the experience you can rely on!"

ESD Conductive flooring